Environmental Consulting

Permitting     Environmental compliance
project management     CEQA/NEPA


CERTIFICATIONS
​SLBE/ELBE    DBE/SWBE    SB (Micro)    WBE    SBA Small Business    WOSB

PROJECTS

Picture

Groundwork San Diego Federal Blvd Chollas Creek Restoration and Trail Project

Kirstin Skadberg Consulting Is the Project Manager for this restoration and trail project on Chollas Creek in City Heights, San Diego. Ms. Skadberg was the primary author of two grant applications that resulted in $6.5M awarded to the project. The cement channel will be removed from this segment of the creek, and the creek channel will be regraded, natural boulders placed, and native plants installed along the bank to return the creek reach to a soft-bottom naturalistic channel. A recreational trail will extend from Home Ave to Sunshine Berardini Field.
Picture

city of san diego north city pure water facility permit work plan

(Sub to Jacobs)
Kirstin Skadberg Consulting worked with Jacobs to prepare the Permit Work Plan for the City of San Diego North City Pure Water Facility, which will treat recycled water to produce 30 million gallons of purified water per day when it is completed in 2021. The plan includes all Federal, State and local permits required for construction and operation of the facility.
Picture

national park service yosemite national park el portal sewer rehabilitation project

(Sub to ARS Aleut Construction)
As the project Environmental Compliance Manager, Kirstin Skadberg Consulting prepared the Environmental Protection Plan (EPP) for the project, and developed and presented the Archaeological, Natural, Cultural and Physical Resources Protection Training to contractor staff.  The EPP included a number of sub-plans including a Waste Management Plan, Contaminant Prevention Plan, Waster Water Management Plan and a Historical, Archaeological, Physical, Cultural and Biological Resources Plan.  KSC also performed a pre-construction tree survey and developed detailed documentation of vegetation on the project site.
Picture

groundwork san diego lenox drive vector habitat remediation construction project

Kirstin Skadberg Consulting was the Project Manager for this restoration project on Chollas Creek in Encanto, San Diego. Two degraded concrete drop structures were removed, and the creek channel was regraded, natural boulders placed, and native plants installed along the banks to return the creek reach to a soft-bottom naturalistic channel.

​
Picture

city of san diego mission valley groundwater feasibility study
​environmental constraints analysis

(Sub to Gillingham Water Planning and Engineering)
Kirstin Skadberg Consulting prepared the Environmental Constraints Analysis for the City of San Diego Public Utility Departments Mission Valley Groundwater Feasibility Study, which analyzed the feasibility of constructing pumps and a water treatment facility in Mission Valley.  The Feasibility Study included an analysis of potential environmental challenges for each of the sites under consideration, as well as a summary of CEQA and permitting requirements expected for the project should it move forward.